Installing PS LT's w/ ORY, need help
I'm installing PS LT's on my 95, and need some help. I'm forced to go from the top, so bare with me here. I have the happy hooker installed, and the engine is raised about 2-3 inches ( mount bolts out ). I'm trying the driver side first, and i have the valve cover, plugs, temp sensor ( talk about a mess! =) ) , steering linkage , oil pressure sensor and oil filter all out of the way, and it doesn't want to go in!! Any tips? Should I lower it, throw in the pass. side bolt, then raise it up to tilt it? I thought about doing that for the pass. side, but didn't think I'd have this much trouble with the drivers side. Thanks fellas!
Can't wait to get these in, they look like real nice pieces!
Mark
Can't wait to get these in, they look like real nice pieces!Mark
Thread
Thread Starter
Forum
Replies
Last Post
dbusch22
LT1 Based Engine Tech
2
Jan 5, 2015 07:14 PM



