Suspension, Chassis, and Brakes Shocks, springs, cages, brakes, sub-frame connectors, etc.

10point roll cage install....anybody got pics of theirs or tips?

Thread Tools
 
Search this Thread
 
Old Apr 29, 2004 | 02:06 PM
  #1  
N2OpwrdTA's Avatar
Thread Starter
Registered User
 
Joined: May 2003
Posts: 503
From: Washington, PA
10point roll cage install....anybody got pics of theirs or tips?

Hi. Well as some of you may know, Im building a fairly high output LT1 Some info can be seen on my site in my signature(it needs updated but still mostly there).

Anyhow, I know that Im going to need a 10pt cage to run 9s the legal way...which I plan on doing. I am concerned about how you guys did the bars on the front of the cage. Im assuming you had to remove the heater and AC, ducts(side ones at least), (maybe relocated the fuse panel??), removed the airbags(mianly passanger side, but both will come out if I do it). But, then how/where did you run it down through the dash at? Did any of you manage to keep any of the heater function at all? I already removed all my AC stuff so thats all gone anyhow. Any help or espically pics from anyone would be of great help. I know probably not many people out there with them, but there has to be a few fast guys around that already went through this. Im going to have a shop do the install(one of the only things im not doing myself) but I still want to make sure they know and I know WTF they are doing, since most dont know how to work on an fbody for ****). Thanks any help!
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
RUENUF
Cars For Sale
1
May 25, 2016 08:10 PM
RUENUF
South Atlantic
4
Mar 13, 2016 03:39 PM
dylan1303
Forced Induction
5
May 22, 2015 12:24 PM
cmyname1
Cars For Sale
2
Feb 19, 2015 08:38 PM
Doug Harden
Automotive News / Industry / Future Vehicle Discussion
29
Jul 30, 2003 07:05 AM




All times are GMT -5. The time now is 06:21 PM.