Has the life cycle of the Corvette been shortened?
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by Eric Bryant
There's this stuff called "technology" that is really changing the world, including the way we design cars. I'd recommend checking into it.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by 91_z28_4me
But this 'technology' stuff as you put it is expensive and prototypes still must be developed and run into the ground correct? As new materials are developed they cost money. I would venture it actually costs more to develop a new chassis now than it did 10 years ago because of the more rigorous testing and the associated cost of technology, would you not agree with that?
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by WERM
Peak torque of an electric motor occurs at 0 rpm.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by JakeRobb
C4: 1983-1996: 14 years
I do agree that you can't really predict when they'll launch a C7 based on Corvette's history. The C6 came about so soon because GM didn't want to allow the C5 to become stale; they didn't want to cachet of the car to wane before replacing it. I guess this is generally the mindset with a car like this, at least with the right people making decisions. The C5 was supposed to launched as a '93.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by 91_z28_4me
But this 'technology' stuff as you put it is expensive and prototypes still must be developed and run into the ground correct? As new materials are developed they cost money. I would venture it actually costs more to develop a new chassis now than it did 10 years ago because of the more rigorous testing and the associated cost of technology, would you not agree with that?
Re: Has the life cycle of the Corvette been shortened?
So, how long will it be before we see a right-hand drive Corvette in Australia? Lutz won't be drawn on an exact time, other than: "The current Corvette won't be around as long as the previous model".
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by Threxx
You just wanted a chance to flame me.
But come on guys it costs just as much or more money to develop the tech that lowers the cost and put it together with new building techniques that have to be developed, and paid for. What makes it more profitable is keeping changes to a minimum and making the business case work in such a way that you have built in enough profit to your vehicle to pay off the excessive initial development costs.
Originally Posted by Z28x
You are forgetting about the wonderful machine known as a computer. CAD and computer testing saves a lot of time, and time = money.
Lets not forget the $100+ Million it took to make a new nose for the 4th gens in 98.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by 91_z28_4me
And how much money does it cost to buy the computers, pay the operators, program the virtual parts that need to be confirmed with real world data?
Originally Posted by 91_z28_4me
Lets not forget the $100+ Million it took to make a new nose for the 4th gens in 98.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by 91_z28_4me
Yeah that is it because this board revolves around you.

Re: Has the life cycle of the Corvette been shortened?
Originally Posted by 91_z28_4me
And how much money does it cost to buy the computers, pay the operators, program the virtual parts that need to be confirmed with real world data?
Since taking my first engineering job in '97, CAD systems have gone from uber-expensive SGI boxes that required a dedicated sysadmin to Wintel boxes that really aren't any more expensive than a hot gaming PC. Running FEA - and more importantly, getting accurate results from FEA - continues to get faster and cheaper. Preliminary crash test results can now be obtained from computer simulations, as can powertrain performance attributes such as emissions and fuel economy. Rapid prototyping machines can put a sample of a part in my hands tomorrow so that I can evaluate it for design and tooling problems, and in some cases I can even throw the part on a test stand to start generating a performance baseline before I've even consulted a tooling shop. If I'm building an electronics module, affordable PCB routers allow me to cut a board in hours instead of waiting days or weeks. There are even means by which we can generate rapid-prototype tools, and production-ready tools take less time than ever to generate with the proliferation of CNC and EDM techniques.
Time is money - human resources, lost market opportunities, the cost of dealing with outdated designs. All of this technology allows engineers to do more with less.
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by Threxx
Well if you say so, but you do take most every opportunity you can find to flame me. This case was made pretty evident by your quick jump to ask me what I've been smoking for making what appears to have been a pretty accurate statement as you've ended up arguing about development costs with, well, people who do the developing - engineers.
As far as my spending my day online searching for ways to flame you, get over yourself. I actually enjoy reading your perspectives into luxury automobiles and gadgetry, as they are outside of my scope of refrence. Since you seem to think all I do is e-stalk you I will simply try not to respond to you in the future, sound good (Ok then lets do that).
Re: Has the life cycle of the Corvette been shortened?
Originally Posted by Eric Bryant
Instead of putting a dollar figure to it, I'll simply quip "less than it did yesterday".
Since taking my first engineering job in '97, CAD systems have gone from uber-expensive SGI boxes that required a dedicated sysadmin to Wintel boxes that really aren't any more expensive than a hot gaming PC. Running FEA - and more importantly, getting accurate results from FEA - continues to get faster and cheaper. Preliminary crash test results can now be obtained from computer simulations, as can powertrain performance attributes such as emissions and fuel economy. Rapid prototyping machines can put a sample of a part in my hands tomorrow so that I can evaluate it for design and tooling problems, and in some cases I can even throw the part on a test stand to start generating a performance baseline before I've even consulted a tooling shop. If I'm building an electronics module, affordable PCB routers allow me to cut a board in hours instead of waiting days or weeks. There are even means by which we can generate rapid-prototype tools, and production-ready tools take less time than ever to generate with the proliferation of CNC and EDM techniques.
Time is money - human resources, lost market opportunities, the cost of dealing with outdated designs. All of this technology allows engineers to do more with less.
Since taking my first engineering job in '97, CAD systems have gone from uber-expensive SGI boxes that required a dedicated sysadmin to Wintel boxes that really aren't any more expensive than a hot gaming PC. Running FEA - and more importantly, getting accurate results from FEA - continues to get faster and cheaper. Preliminary crash test results can now be obtained from computer simulations, as can powertrain performance attributes such as emissions and fuel economy. Rapid prototyping machines can put a sample of a part in my hands tomorrow so that I can evaluate it for design and tooling problems, and in some cases I can even throw the part on a test stand to start generating a performance baseline before I've even consulted a tooling shop. If I'm building an electronics module, affordable PCB routers allow me to cut a board in hours instead of waiting days or weeks. There are even means by which we can generate rapid-prototype tools, and production-ready tools take less time than ever to generate with the proliferation of CNC and EDM techniques.
Time is money - human resources, lost market opportunities, the cost of dealing with outdated designs. All of this technology allows engineers to do more with less.