AL SS590 M6
02-04-2003, 12:57 AM
With the warmer temps I've been able to get the pole barn warm enough to spend a couple of afternoons out there.
Friday I got the restalled converter and trans installed.
Today I put the drive shaft, DS loop, and G-load brace back in. Then I prepped the subframe connectors and body and clamped them in place. Tomorrow I'll tough it out and weld them in.
Lots more to do.
QA1 kit....install
exhaust....add bullet muffler
plugs.....almost 20,000 miles on these
air bag....install and hook up Where can I get the air fittings???
2 step....install then test the whole shebang
So I need some more of the warmer days:mad:
Friday I got the restalled converter and trans installed.
Today I put the drive shaft, DS loop, and G-load brace back in. Then I prepped the subframe connectors and body and clamped them in place. Tomorrow I'll tough it out and weld them in.
Lots more to do.
QA1 kit....install
exhaust....add bullet muffler
plugs.....almost 20,000 miles on these
air bag....install and hook up Where can I get the air fittings???
2 step....install then test the whole shebang
So I need some more of the warmer days:mad: