Re: How long does it take for an build order to get "picked up in the system" by GM?

Originally Posted by Darth Xed
Thanks for the link, I didnt know about this site.

It doesn't look like it is an actual GM site, though... how are they associated or how do they get the order info if that is correct?
It is not a GM site. They interface with a GM computer to give you your information. It only reports what the GM computer reports so if you find an error in your order, you should contact your dealership and ask them to double check.
Hylton is offline  
Old 01-26-2011, 11:34 PM
  #17  
Registered User
 
CLEAN's Avatar
 
Join Date: Dec 2000
Location: Arlington, Texas
Posts: 2,576
Re: How long does it take for an build order to get "picked up in the system" by GM?

It should go in within a week, w/ the order being picked up shortly thereafter. The only reason it wouldn't would be was if the dealer didn't have allocation, or if some option you selected was on constraint, neither of which is likely w/ a Traverse. You should be driving it in 6-8 weeks.

Congrats! If you ever need to shrink your fleet, keep me in mind .

Last edited by CLEAN; 01-26-2011 at 11:39 PM.
CLEAN is offline  
Old 02-10-2011, 09:26 AM
  #18  
Registered User
Thread Starter
 
Darth Xed's Avatar
 
Join Date: Dec 2000
Location: Ohio
Posts: 8,504
Re: How long does it take for an build order to get "picked up in the system" by GM?

Well, I got notified yesterday that our Traverse just came off the truck (yesterday)


That is a grand total of just 20 DAYS from the night I placed the order at the dealership to the day it was delivered to the dealership!

That is pretty damn fast!
Darth Xed is offline  
Old 02-10-2011, 09:36 AM
  #19  
Registered User
 
Z28x's Avatar
 
Join Date: Jan 2000
Location: Albany, NY
Posts: 10,287
Re: How long does it take for an build order to get "picked up in the system" by GM?

Originally Posted by Darth Xed
Well, I got notified yesterday that our Traverse just came off the truck (yesterday)


That is a grand total of just 20 DAYS from the night I placed the order at the dealership to the day it was delivered to the dealership!

That is pretty damn fast!
Wow, that is very fast. I remember my parents ordering a car and it took them months to get it.
Z28x is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
dbusch22
Forced Induction
6
10-31-2016 11:09 AM
pimpss96
LT1 Based Engine Tech
4
02-12-2015 01:28 PM
Bearmans
2010 - 2015 Camaro News, Sightings, Pictures, and Multimedia
2
12-03-2014 05:28 AM
sleeperZ96BT
Car Audio and Electronics
3
07-24-2002 11:28 AM



Quick Reply: How long does it take for an build order to get "picked up in the system" by GM?



All times are GMT -5. The time now is 07:21 AM.