Re: 2nd project started (even faster)
i took the whole entire air box out i left the piece of tube with the sensor on and just put a aftermarket air filter on it because the 93-97 hood wont close with the air box there u might be able to get the air box from one of the 93=97 and make it fit but all the front clip parts bolt right up just need the bumper reinforcement i had to cut the things on the side tha hold the plastic hood twist thing i cant remember the name of them it only took me like 3 hours
|
Re: 2nd project started (even faster)
8 Attachment(s)
Ok so when I got this SS the original owner decided to put this vinyl on. Maybe it was ok for some but not for me. So this it what it was to as it sits outside infront of my house right now
Attachment 6895 Attachment 6896 Attachment 6897 Attachment 6898 Attachment 6899 Attachment 6900 Attachment 6901 Attachment 6902 |
Re: 2nd project started (even faster)
The curve under the mirror definitely looks odd. Much better looking without it.
|
Re: 2nd project started (even faster)
they are beginning to resemble each other
Z28 / SS http://ls1tech.com/forums/attachment...-camaro22a.jpg http://i1268.photobucket.com/albums/...-10-38_926.jpg |
Re: 2nd project started (even faster)
2 Attachment(s)
|
Re: 2nd project started (even faster)
7 Attachment(s)
had a spare set of rear marker lights lying around so spent a little time doing this today
Attachment 6808 Attachment 6809 Attachment 6810 Attachment 6811 just waiting for paint to dry to pull bowtie off. Attachment 6812 added clear, finished piece Attachment 6813 Attachment 6814 |
Re: 2nd project started (even faster)
4 Attachment(s)
the hood and front bumper cover this car will be getting
Attachment 6544 Attachment 6545 Attachment 6546 Attachment 6547 |
Re: 2nd project started (even faster)
Finally got around to do some work on the car. I did the rear lowering springs, I have Bilstein front and rear shocks coming on tuesday so I will lower the front Wednesday.
here are some photos of how rusted / shot the strut mounts were and the lowered rear. [IMG]http://i1268.photobucket.com/albums/...ps39c78f48.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...ps934c26d6.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...psfb89bf2a.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...psa5be0c02.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...ps40b71779.jpg[/IMG] |
Re: 2nd project started (even faster)
Also got the front spoiler for the other front end going on the car here are some photos of that before and after.
[IMG]http://i1268.photobucket.com/albums/...ps23b689f1.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...psc6d1e01c.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...ps0993c706.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...pscb6d20be.jpg[/IMG] [IMG]http://i1268.photobucket.com/albums/...psda41cbe8.jpg[/IMG] Also got in the new upper front shock mounts...so now I can finish lowering the front of the car. [IMG]http://i1268.photobucket.com/albums/...ps1f58c809.jpg[/IMG] |
Re: 2nd project started (even faster)
7 Attachment(s)
did some work on the driver front fender....here are some photos of that process, its already for paint now. fender from beginning to end all prep done by me.
Attachment 5964 Attachment 5965 Attachment 5966 Attachment 5967 Attachment 5968 Attachment 5969 Attachment 5970 |
Re: 2nd project started (even faster)
5 Attachment(s)
|
Re: 2nd project started (even faster)
6 Attachment(s)
well the car is lowered BMR springs Bilstein rear and front shocks, BMR adj pan hard bar, new upper front shock mounts.
Attachment 5950 Attachment 5951 Attachment 5952 Attachment 5953 After----------v Attachment 5954 Attachment 5955 Before----------^ the springs have some settling to do, should have a nice stance after settling down. |
Re: 2nd project started (even faster)
1 Attachment(s)
With a little bit of help the SS was photoshopped to give me an idea what this car will look like in the near future. I still need to fix the wheels, sail panel and roof, and wheels.
Attachment 5601 |
Re: 2nd project started (even faster)
3 Attachment(s)
picked up new shoes for the SS. Ups dropped this off at my front door.
toyo proxes r888 305/35/18 and 275/35/18 Attachment 4255 Attachment 4256 Attachment 4257 |
Re: 2nd project started (even faster)
7 Attachment(s)
here are some photos of the wheels being stripped and repowder coated and the motor i'll be getting the block from and I mounted the proxes r888 on the the other set of Z06 wheels I have.
Attachment 4248 Attachment 4249 Attachment 4250 Attachment 4251 Attachment 4252 the wheels repowdercoated Attachment 4253 Attachment 4254 |
All times are GMT -5. The time now is 08:01 PM. |
© 2024 MH Sub I, LLC dba Internet Brands